{"id":10229,"date":"2024-07-11T03:20:57","date_gmt":"2024-07-11T03:20:57","guid":{"rendered":"https:\/\/www.geoquest-group.com.au\/?post_type=avada_portfolio&p=10229"},"modified":"2024-10-02T00:45:24","modified_gmt":"2024-10-02T00:45:24","slug":"sydney-gateway-project-mse-retaining-walls","status":"publish","type":"avada_portfolio","link":"https:\/\/www.geoquest-group.com.au\/reinforced-earth\/sydney-gateway-project-mse-retaining-walls\/","title":{"rendered":"MSE Retaining Walls Sydney Gateway"},"content":{"rendered":"
The Sydney Gateway project, spanning from 2021 to 2024, is set to revolutionise connectivity in one of Australia’s busiest urban areas. Located at Sydney Airport in New South Wales, the project provides a toll-free connection from the St Peters Interchange, significantly improving journey times to the airport, the M5 and the Eastern Distributor.<\/p>\n
Dubbed the missing link in Sydney\u2019s motorway network, Sydney Gateway will enhance access to the Airport Precinct, offering a high-capacity network and more reliable journeys.<\/p>\n
Geoquest played a pivotal role in the Sydney Gateway project, tasked with providing more than 50 Reinforced Earth\u00ae mechanically stabilised walls (MSE) across five main work areas: Northern Lands, St Peters Interchange, Tempe Tip, Airport Drive and Qantas Drive.<\/p>\n
These Reinforced Earth\u00ae structures, included abutment walls, approach ramps and retaining walls of various heights and complexities, cover an area exceeding 15,000m\u00b2. For this project Geoquest developed 3m wide by 1.5m high TerraPlus\u00ae concrete panels, utilising roughly 500 tons of soil reinforcing strips, with the tallest wall standing more than 8.5m high.<\/p>\n
Key features of Geoquest\u2019s project include:<\/p>\n
A Transport for New South Wales initiative, the $2.6 billion Sydney Gateway project commenced in November 2021, with construction peaking between April and August 2022, with the remaining stages to be completed 2024. Featuring a total of 19 bridges, including one that is wider than the Sydney Harbour Bridge, and offering a direct connection to the new Sydney motorway network at St Peters Interchange, Sydney Gateway not only streamlines travel for motorists but divert up to 10,000 trucks a day from local streets.<\/p>\n
Significant milestones for Geoquest in the project include the completion of a package enabling the Twin Arch Bridge launch over Alexandra Canal and the completion of work packages that helped to finalise a flyover for Airport Drive. The project was spearheaded by the John Holland and Seymour Whyte Joint Venture (JHSW), with Seymour Whyte, like Geoquest, being a subsidiary of Vinci Group.<\/p>\n
Several innovative technologies and methods were utilised by the Geoquest team in this project, including:<\/p>\n
These innovations enhance production efficiency, panel stability, and flexibility in casting custom panels, contributing to overall project sustainability.<\/p>\n
The project has made a significant positive impact on both the local community and the broader Sydney area. It\u2019s estimated $2.2 billion of economic activity was created for businesses supplying goods and services to the project.<\/p>\n
In Albury, NSW, Geoquest\u2019s production line provided employment for 12 dedicated workers and attracted internships, some leading to permanent positions. In Sydney, the project created more than 4,300 jobs and is expected to cut morning travel time by up to 40 minutes for motorists from Parramatta to the Airport. It also returned local roads to communities and improve pedestrian and cycling links, enhancing community spaces.<\/p>\n
Environmental considerations were also a key aspect of the project, incorporating a 25% SCM (FA) concrete mix, replacing cement with flyash, contributing to environmental sustainability.<\/p>\n
For more information and to view time-lapse videos, visit Sydney Gateway<\/a>. Contact your local Geoquest office<\/a> to discuss your MSE wall and precast panel needs for road and rail infrastructure projects.<\/p>\n<\/div>RELATED SOLUTIONS<\/h4><\/a><\/li>
RELATED MARKETS<\/h4><\/a><\/li>
RELATED COUNTRIES<\/h4><\/a><\/li><\/ul><\/div>
RELATED SOLUTIONS<\/h4><\/a><\/li><\/ul><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tTechWall™ Retaining Walls for Pedestrian Crossing<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tReinforced Earth\u00ae Walls for Highway 407 East Phase 2<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tReinforced Earth\u00ae Access Ramps for Dakar Express Railway<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tApproach Road, True Abutment for Mactan-Cebu Airport<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tVictoria's Big Build - Rail Transformation<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tMSE Retaining Walls Sydney Gateway<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tTechSpan and MSE walls for complex road project<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tRiver training<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tReinforced Earth\u00ae Walls for Ramps and Abutments at Clark Airport<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tChaffey Dam, NSW: Reinforced Earth\u00ae for Upgrade<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tNoise walls for Claisebrook Rail Depot<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tQuays and jetties<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tMSE retaining walls for Melbourne's West Gate Tunnel<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tAdelaide's Ovingham Level Crossing Removal<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>
\r\n\t\t\t\t\t\t\t<\/a>\r\n\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t
\r\n\t\t\t\t\t\t\tReinforced Earth\u00ae Retaining Walls for Cinta Costera Seafront<\/a>\r\n\t\t\t\t\t\t<\/h4>\r\n\t\t\t\t\t<\/div>\r\n\t\t\t\t<\/div><\/div>